South Park Bridge - Project photo documentary

July and August 2011

August 2011

Manitowac 4100W crane sits atop north bascule pier. Visible underneath are 2 of 4 new steel posts installed to support the crane.
Aug. 31, 2011
A Manitowac 4100W crane sits atop north bascule pier. Visible underneath are 2 of 4 new steel posts installed to support the crane.
Photo by John Stamets
Enlarged view (135KB .jpg)
A new view opens up the day after removal of the south pile wall.
Aug. 31, 2011
A new view opens up the day after removal of the south pile wall.
Photo by John Stamets
Enlarged view (104KB .jpg)


Cofferdam construction at low tide - and lunchtime.
Aug. 30, 2011
Cofferdam construction at low tide (and lunchtime).
Photo by John Stamets
Enlarged view (147KB .jpg)
Cofferdam template for Pier 4 is shown here in its final position.
Aug. 18, 2011
Cofferdam template for Pier 4 is shown here in its final position.
Photo by John Stamets
Enlarged view (151KB .jpg)


Skiffs herd mini barge to dock with barge.
Aug. 18, 2011
Skiffs herd mini barge to dock with barge.
Photo by John Stamets
Enlarged view (148KB .jpg)
Cofferdam template is almost ready for installation near north bank.
Aug. 17, 2011
Cofferdam template is almost ready for installation near north bank.
Photo by John Stamets
Enlarged view (112KB .jpg)


Huge barge crane is parked for two days in channel between piers.
Aug. 17, 2011
Huge barge crane (the DB General) is parked for two days in channel between piers.
Photo by John Stamets
Enlarged view (140KB .jpg)
Lift arrives on site by tugboat, not by flatbed truck
Aug. 11, 2011
Lift arrives on site by tugboat, not by flatbed truck.
Photo by John Stamets
Enlarged view (131KB .jpg)


Crane pad horizontal components under construction on north bridge deck.
Aug. 5, 2011
Crane pad's horizontal components under construction on north bridge deck.
Photo by John Stamets
Enlarged view (108KB .jpg)
Opening day of bridging season
Aug. 1, 2011
Opening day of bridging season.
Photo by John Stamets
Enlarged view (108KB .jpg)


July 2011

North pier of the old South Park Bridge.
July 3, 2011
North pier of the old South Park Bridge.
Photo by John Stamets
Enlarged view (95KB .jpg)
South part of the old South Park Bridge at an extreme low tide.
July 3, 2011
South part of the old South Park Bridge at an extreme low tide.
Photo by John Stamets
Enlarged view (119KB .jpg)



Information on the South Park Bridge website is available to people with disabilities in alternate formats upon request by calling 206-263-6482 or 711 for the TTY relay service.

External link = External link

Share |

Also see

South Park Bridge info line:
206-263-9979

Sign up for updates

Contact
King County Department of Transportation
Ashley DeForest
201 S. Jackson St.,
KSC-TR-0824
Seattle, WA 98104-3856
Voice: 206-263-9979
TTY relay: 711