South Park Bridge - Project photo documentaryDecember 2011Click on cropped photos below to see the full views.
 Dec. 30, 2011 View from the south bank at sunset. Photo by John Stamets Enlarged view (114KB .jpg) |
|
 Dec. 30, 2011 Landscape at sunset featuring top of a drilled shaft for Pier 1. Photo by John Stamets Enlarged view (157KB .jpg) |
|
 Dec. 29, 2011 Gravel (7/8") is hoisted to top, then dumped into pneumatic vibratory probe. Photo by John Stamets Enlarged view (91KB .jpg) |
 Dec. 29, 2011 Gravel is pneumatically forced 40 ft. into the earth. Soil is compacted to the side. Photo by John Stamets Enlarged view (110KB .jpg) |
|
 Dec. 29, 2011 The second lift of the south Pier 3 caisson (foreground) appears to be at the same level as the third lift at Pier 4. Photo by John Stamets Enlarged view (143KB .jpg) |
|
 Dec. 21, 2011 It's a stretch for the green concrete pumper to reach the second lift of the south caisson. Photo by John Stamets Enlarged view (114KB .jpg) |
 Dec. 21, 2011 Nice December weather facilitates pour of the second lift of the south caisson. Photo by John Stamets Enlarged view (199KB .jpg) |
|
 Dec. 17, 2011 Three drilled shafts for Pier 2 are ready to be built upon. Photo by John Stamets Enlarged view (182KB .jpg) |
|
 Dec. 17, 2011 Looking down into middle drilled shaft for Pier 2. Photo by John Stamets Enlarged view (164KB .jpg) |
 Dec. 17, 2011 This bucket enjoys dredging. Photo by John Stamets Enlarged view (186KB .jpg) |
|
 Dec. 16, 2011 Deep native soil is dredged from third lift of north caisson. Photo by John Stamets Enlarged view (139KB .jpg) |
|
 Dec. 15, 2011 Iron workers build walls for second lift of south caisson. Photo by John Stamets Enlarged view (208KB .jpg) |
 Dec. 15, 2011 Curtain of green epoxy-coated rebar is placed at top of second lift of south caisson. Photo by John Stamets Enlarged view (193KB .jpg) |
|
 Dec. 15, 2011 Rebar curtain flies to south caisson. Photo by John Stamets Enlarged view (161KB .jpg) |
|
 Dec. 14, 2011 Green eboxy-coated rebar is installed for lower part of the second lift of the south caisson. Photo by John Stamets Enlarged view (195KB .jpg) |
 Dec. 14, 2011 Drilling down final shaft on the south side. Photo by John Stamets Enlarged view (161KB .jpg) |
|
 Dec. 8, 2011 Rodbusters like the new octagonal design of the support ring. Photo by John Stamets Enlarged view (119KB .jpg) |
|
 Dec. 8, 2011 Spiral rebar cage for second drilled shaft of Pier 1 on south side. Photo by John Stamets Enlarged view (161KB .jpg) |
 Dec. 8, 2011 Spiral rebar cage being inserted into second of four drilled shafts for Pier 1. Photo by John Stamets Enlarged view (146KB .jpg) |
|
 Dec. 8, 2011 Dredging clean gravel from second lift (level) of south caisson. Photo by John Stamets Enlarged view (149KB .jpg) |
|
 Dec. 7, 2011 Hammer grab spills water as it digs out the second shaft for Pier 1. Photo by John Stamets Enlarged view (151KB .jpg) |
 Dec. 7, 2011 Spiral rebar cages for Pier 1 are 70 ft. long with 7 ft. diameters. Photo by John Stamets Enlarged view (153KB .jpg) |
|
 Dec. 7, 2011 Candy-cane rebar tops 70 ft. rebar cage. Extended rods are for sonically testing quality of concrete pour. Photo by John Stamets Enlarged view (160KB .jpg) |
|
 Dec. 6, 2011 Landscape with second 70 ft. spiral rebar cage almost ready for Pier 1. Photo by John Stamets Enlarged view (113KB .jpg) |
 Dec. 6, 2011 Green pumper fills shaft with concrete as oscillator machine pulls casing out of hole. Photo by John Stamets Enlarged view (196KB .jpg) |
|
|
|