Permit feesEffective January 1, 2012, the fees and rates charged by the King County Department of Development and Environmental Services (DDES) for permitting services have been updated per ordinance 17224. To make permit fees more predictable, most land use and site development inspection fees have been converted from hourly charges to fixed fees amounts for new applications in 2012. For a list of current permits fees, see the 2012 Fee Schedule. NOTE: More than one fee may apply to an application or permit. Determining Fee Requirements Fees for permits issued by DDES for unincorporated King County depend upon: the type of permit, the size of the project, the scope of the project, and site issues, including drainage and critical areas.
The most common types of fees applicable to construction projects include: 1. Permit administration fees are charged when a permit application is accepted and when a permit is issued. 2. Building plan review and inspection fees are determined by the new square footage of the project and its value of construction, using cost estimates published by the International Conference of Building Officials. Applicants are required to submit the fee for plan review at intake; inspection fees are due at the time of permit issuance. 3. Erosion Control Inspection Fee is due at issuance for any building project requiring soil disturbance. The inspection fees range from $89.25 to $242.55 depending on the type of residential project. 4. Mechanical review and inspection fees are charged when permit applications are accepted and when permits are issued. 5. Zoning and site conditions review is required on most commercial projects and on all new residences proposing over 2,000 square feet of impervious surface and may be required due to other site-related issues/conditions. A fixed review fee is due at application intake, the amount of which depends on the type of construction. For a new single family residence, the fee is $749.70. If site conditions require site engineering for drainage, road design, fire flow, or other review, additional site engineering review fees will be required. These additional fees will be due at the time of permit issuance. 6. Critical areas review may be necessary for some projects that show critical areas either on the project site or on an adjacent property. Additional review fees may be assessed and will be due at permit issuance. These fees can range from an initial site inspection charge of $392.70 to review fees of $2,499 if the applicant chooses a preferred consultant to study critical areas. 7. Clearing and grading or forest practice review may be necessary for some projects. The review fees are based upon the extent of clearing and are due at permit issuance. 8. Fire flow and access review is required of most building permits. Fees are due at permit intake and range from $89.25 to $535.50 depending on the type of occupancy and sprinkler requirement. 9. New septic systems, permitted by the Public Health Department, may require first obtaining a Critical Areas Designation. Please refer to Customer Information Bulletin #21, Critical Areas Review, for more information. Improvements on properties serviced by an existing septic system are also required to be reviewed and approved by the Public Health Department prior to the issuance of a permit. (Current Wastewater Program fees can be found here) 10. School impact fees are assessed at the time of permit intake for all new residential dwelling units. Replacement residences are exempt from this fee for three years. In addition to the school impact fee, a nonrefundable administrative fee of $65 per dwelling unit is charged to those projects subject to a school impact fee and these fees are collected at permit issuance. Please refer to Customer Information Bulletin #46, School Impact Mitigation Measures, for a list of school districts and their impact fees. School impact fees are updated annually by ordinance, and are collected by DDES oin behalf of school districts. 11. Road MPS (Mitigated Payment System) fees re also assessed at intake for all new residences. There are over 450 MPS zones within unincorporated King County. Customers can determine their MPS zone by using Parcel Viewer or iMAP (King County's online property search tools at http://your.kingcounty.gov/gis/Mapportal/iMAP_main.htm) to locate their property and then the property’s Districts Report where the Roads MPS Zone is listed. To find the fee per zone, go online to http://www.kingcounty.gov/transportation/kcdot/Roads/TransportationPlanning/MitigationPaymentSystem/FeeSchedule.aspx. Road MPS fees and an associated $60 administrative fee are due at permit issuance. The Road MPS fee is collected by DDES on behalf of the County Department of Transportation.. 12. State Building Code. All building permits are assessed $4.50 for maintenance of the State Building Code. This fee is collected by DDES on behalf of the state. Most permit fees charged by DDES are fixed amounts. To assist applicants in estimating the permits fee applicable to their projects, DDES is developing a fee calculator for public use on the DDES web-site. Installation of the on-line fee calculator is expected by the end of 2012. Hourly Fee EstimatesFor projects that are subject to hourly charges instead of fixed fees, applicants may request a pre-application conference with DDES staff for the preparation of a detailed and binding fee estimate. Be sure to also look at application materials and customer information bulletins where you can find application packets and helpful customer information for many of our permit types Fee waivers In accordance with 27.02.020 (PDF*, 295KB) of the King County Code, fee waivers are granted at the discretion of the DDES Director and are limited to criteria summarized as follows: - if fees collected are for service not performed
- if fees duplicate another fee or charge for a service for which a fee has already been collected
- if fees are based on a professional error or unnecessary review by a DDES employee
- if a customer has incurred additional expenses due to a process error by DDES staff
- if fees are assessed to replace, repair, abate or demolish a structure due to property damage caused by a natural disaster.
Procedures for filing a fee waiver request are detailed on the Fee Waiver / Adjustment Of Fees Authorization form. To request a fee waiver, complete and submit the form, available in PDF* or fill-in Word* format. Quality service to our customers is very important to DDES. If you are unable to find the fee information you are looking for, e-mail DDESWebInquiries@kingcounty.gov and we will respond to you quickly.
*Note: To view PDFs, free software from Adobe is required. Fill-in Word documents require Microsoft software. For assistance and fill-in instructions, see helpful hints. To request this information in alternate formats for people with disabilities, call 206-296-6600 or TTY Relay: 711. 2012 Fee Schedule Table
| Fee Definitions 2012 Fee Schedule |
| Pre Submittal Services - KCC 27.06.010 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Conference - Already-Built Construction Project |
510.00 |
25.50 |
535.50 |
| |
Conference - Agricultural Building or Activity, per DDES Staff Person |
255.00 |
12.75 |
267.75 |
| |
Conference - Other Project, per DDES Staff Person |
510.00 |
25.50 |
535.50 |
| |
Field Check, each per DDES Staff Person |
510.00 |
25.50 |
535.50 |
| |
Fee Estimate, each |
510.00 |
25.50 |
535.50 |
| |
Project Review |
340.00 |
17.00 |
357.00 |
| |
Other Project Consultation Not Listed |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Permit Administration - KCC 27.06.020 | 2012 Fee | 5% Surcharge | Total Fees |
| Permit administration fees are charged upon application submittal and permit issuance |
| |
Group 1 |
111.00 |
5.55 |
116.55 |
| |
Group 2 |
225.00 |
11.25 |
236.25 |
| |
Group 3 |
317.00 |
15.85 |
332.85 |
| |
Group 4 |
961.00 |
48.05 |
1,009.05 |
| Fee Definitions 2012 Fee Schedule |
| Building Plan Review - KCC 27.10.020 | 2012 Fee | 5% Surcharge | Total Fees |
| | Standard Method or Materials, Initial Review |
|
|
|
| |
Valuation $1 - $500: Base Fee |
15.28 |
0.76 |
16.04 |
| |
Valuation $500.01 - $2,000: Base Fee |
15.28 |
0.76 |
16.04 |
| |
Valuation $500.01 - $2,000: Fee per $100 of Additional Value > $500 |
1.98 |
0.10 |
2.08 |
| |
Valuation $2,000.01 - $25,000: Base Fee |
45.01 |
2.25 |
47.26 |
| |
Valuation $2,000.01 - $25,000: Fee per $1000 of Additional Value > $2,000 |
9.10 |
0.46 |
9.56 |
| |
Valuation $25,000.01 - $50,000: Base Fee |
254.31 |
12.72 |
267.03 |
| |
Valuation $25,000.01 - $50,000: Fee per $1000 of Additional Value > $25,000 |
6.57 |
0.33 |
6.90 |
| |
Valuation $50,000.01 - $100,000: Base Fee |
418.44 |
20.92 |
439.36 |
| |
Valuation $50,000.01 - $100,000: Fee per $1000 of Additional Value > $50,000 |
4.55 |
0.23 |
4.78 |
| |
Valuation $100,000.01 - $500,000: Base Fee |
645.94 |
32.30 |
678.24 |
| |
Valuation $100,000.01 - $500,000: Fee per $1000 of Additional Value > $100,000 |
3.64 |
0.18 |
3.82 |
| |
Valuation $500,000.01 - $1,000,000: Base Fee |
2,101.94 |
105.10 |
2,207.04 |
| |
Valuation $500,000.01 - $1,000,000: Fee per $1000 of Additional Value > $500,000 |
3.09 |
0.15 |
3.24 |
| |
Valuation More Than $1,000,000: Base Fee |
3,645.69 |
182.28 |
3,827.97 |
| |
Valuation More Than $1,000,000: Fee per $1000 of Additional Value > $1,000,000 |
2.05 |
0.10 |
2.15 |
| |
Agricultural Building in the APD or RA-Zone with Farm Plan |
510.00 |
25.50 |
535.50 |
| |
Revisions, including pre-registered basic plans |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Non-Standard Method or Materials |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Mechanical System Plan Review - KCC 27.10.030 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Residential, per Dwelling Unit |
133.00 |
6.65 |
139.65 |
| | Commercial, Standard Method or Materials, Initial Review |
|
|
|
| |
Valuation $1 - $500: Base Fee |
23.50 |
1.18 |
24.68 |
| |
Valuation $500.01 - $2,000: Base Fee |
23.50 |
1.18 |
24.68 |
| |
Valuation $500.01 - $2,000: Fee per $100 of Additional Value > $500 |
3.05 |
0.15 |
3.20 |
| |
Valuation $2,000.01 - $25,000: Base Fee |
69.25 |
3.46 |
72.71 |
| |
Valuation $2,000.01 - $25,000: Fee per $1000 of Additional Value > $2,000 |
14.00 |
0.70 |
14.70 |
| |
Valuation $25,000.01 - $50,000: Base Fee |
391.25 |
19.56 |
410.81 |
| |
Valuation $25,000.01 - $50,000: Fee per $1000 of Additional Value > $25,000 |
10.10 |
0.51 |
10.61 |
| |
Valuation $50,000.01 - $100,000: Base Fee |
643.75 |
32.19 |
675.94 |
| |
Valuation $50,000.01 - $100,000: Fee per $1000 of Additional Value > $50,000 |
7.00 |
0.35 |
7.35 |
| |
Valuation $100,000.01 - $500,000: Base Fee |
993.75 |
49.69 |
1,043.44 |
| |
Valuation $100,000.01 - $500,000: Fee per $1000 of Additional Value > $100,000 |
5.60 |
0.28 |
5.88 |
| |
Valuation $500,000.01 - $1,000,000: Base Fee |
3,233.75 |
161.69 |
3,395.44 |
| |
Valuation $500,000.01 - $1,000,000: Fee per $1000 of Additional Value > $500,000 |
4.75 |
0.24 |
4.99 |
| |
Valuation More Than $1,000,000: Base Fee |
5,608.75 |
280.44 |
5,889.19 |
| |
Valuation More Than $1,000,000: Fee per $1000 of Additional Value > $1,000,000 |
3.15 |
0.16 |
3.31 |
| |
Revisions |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Non-Standard Method or Materials |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Building Construction Inspection - KCC 27.10.320 | 2012 Fee | 5% Surcharge | Total Fees |
| | Standard Method or Materials |
|
|
|
| |
Valuation $1 - $500: Base Fee |
23.50 |
1.18 |
24.68 |
| |
Valuation $500.01 - $2,000: Base Fee |
23.50 |
1.18 |
24.68 |
| |
Valuation $500.01 - $2,000: Fee per $100 of Additional Value > $500 |
3.05 |
0.15 |
3.20 |
| |
Valuation $2,000.01 - $25,000: Base Fee |
69.25 |
3.46 |
72.71 |
| |
Valuation $2,000.01 - $25,000: Fee per $1000 of Additional Value > $2,000 |
14.00 |
0.70 |
14.70 |
| |
Valuation $25,000.01 - $50,000: Base Fee |
391.25 |
19.56 |
410.81 |
| |
Valuation $25,000.01 - $50,000: Fee per $1000 of Additional Value > $25,000 |
10.10 |
0.51 |
10.61 |
| |
Valuation $50,000.01 - $100,000: Base Fee |
643.75 |
32.19 |
675.94 |
| |
Valuation $50,000.01 - $100,000: Fee per $1000 of Additional Value > $50,000 |
7.00 |
0.35 |
7.35 |
| |
Valuation $100,000.01 - $500,000: Base Fee |
993.75 |
49.69 |
1,043.44 |
| |
Valuation $100,000.01 - $500,000: Fee per $1000 of Additional Value > $100,000 |
5.60 |
0.28 |
5.88 |
| |
Valuation $500,000.01 - $1,000,000: Base Fee |
3,233.75 |
161.69 |
3,395.44 |
| |
Valuation $500,000.01 - $1,000,000: Fee per $1000 of Additional Value > $500,000 |
4.75 |
0.24 |
4.99 |
| |
Valuation More Than $1,000,000: Base Fee |
5,608.75 |
280.44 |
5,889.19 |
| |
Valuation More Than $1,000,000: Fee per $1000 of Additional Value > $1,000,000 |
3.15 |
0.16 |
3.31 |
| |
Agricultural Building in the APD or RA-Zone with Farm Plan |
510.00 |
25.50 |
535.50 |
| |
Mobile Home (KCC 27.10.450) |
380.00 |
19.00 |
399.00 |
| |
Mobile Home: Non-Insignia (KCC 27.10.450) |
302.00 |
15.10 |
317.10 |
| |
Mobile Home: Temporary Placement (KCC 27.10.450) |
302.00 |
15.10 |
317.10 |
| |
Mobile Home: Temporary Placement for Medical Hardship (KCC 27.10.450) |
302.00 |
15.10 |
317.10 |
| |
Building Code Compliance (KCC 27.10.430) |
217.00 |
10.85 |
227.85 |
| |
Building Damage (KCC 27.10.430) |
217.00 |
10.85 |
227.85 |
| |
Building Demolition (KCC 27.10.430) |
217.00 |
10.85 |
227.85 |
| |
Building Relocation (KCC 27.10.430) |
217.00 |
10.85 |
227.85 |
| |
Non-Standard Method or Materials |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Re-Inspection, each |
217.00 |
10.85 |
227.85 |
| Fee Definitions 2012 Fee Schedule |
| Building Construction Erosion Control Inspection - KCC 27.10.320 | 2012 Fee | 5% Surcharge | Total Fees |
| |
New - Single/Modular Home |
231.00 |
11.55 |
242.55 |
| |
New - Basic |
194.00 |
9.70 |
203.70 |
| |
New - Accessory Dwelling Unit or Mobile Home |
170.00 |
8.50 |
178.50 |
| |
Addition or Improvement |
112.00 |
5.60 |
117.60 |
| |
Not Otherwise Listed |
85.00 |
4.25 |
89.25 |
| |
Re-inspection, each |
regular fee |
0.05 |
|
| Fee Definitions 2012 Fee Schedule |
| Mechanical System Inspection - KCC 27.10.330 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Residential |
184.00 |
9.20 |
193.20 |
| | Commercial |
|
|
|
| |
Valuation $1 - $500: Base Fee |
23.50 |
1.18 |
24.68 |
| |
Valuation $500.01 - $2,000: Base Fee |
23.50 |
1.18 |
24.68 |
| |
Valuation $500.01 - $2,000: Fee per $100 of Additional Value > $500 |
3.05 |
0.15 |
3.20 |
| |
Valuation $2,000.01 - $25,000: Base Fee |
69.25 |
3.46 |
72.71 |
| |
Valuation $2,000.01 - $25,000: Fee per $1000 of Additional Value > $2,000 |
14.00 |
0.70 |
14.70 |
| |
Valuation $25,000.01 - $50,000: Base Fee |
391.25 |
19.56 |
410.81 |
| |
Valuation $25,000.01 - $50,000: Fee per $1000 of Additional Value > $25,000 |
10.10 |
0.51 |
10.61 |
| |
Valuation $50,000.01 - $100,000: Base Fee |
643.75 |
32.19 |
675.94 |
| |
Valuation $50,000.01 - $100,000: Fee per $1000 of Additional Value > $50,000 |
7.00 |
0.35 |
7.35 |
| |
Valuation $100,000.01 - $500,000: Base Fee |
993.75 |
49.69 |
1,043.44 |
| |
Valuation $100,000.01 - $500,000: Fee per $1000 of Additional Value > $100,000 |
5.60 |
0.28 |
5.88 |
| |
Valuation $500,000.01 - $1,000,000: Base Fee |
3,233.75 |
161.69 |
3,395.44 |
| |
Valuation $500,000.01 - $1,000,000: Fee per $1000 of Additional Value > $500,000 |
4.75 |
0.24 |
4.99 |
| |
Valuation More Than $1,000,000: Base Fee |
5,608.75 |
280.44 |
5,889.19 |
| |
Valuation More Than $1,000,000: Fee per $1000 of Additional Value > $1,000,000 |
3.15 |
0.16 |
3.31 |
| |
Re-Inspection, each |
184.00 |
9.20 |
193.20 |
| Fee Definitions 2012 Fee Schedule |
| Fire System Review - KCC 27.10.050 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Alarm System, per system |
340.00 |
17.00 |
357.00 |
| |
Alarm System, per device |
8.00 |
0.40 |
8.40 |
| |
Emergency Generator, each |
510.00 |
25.50 |
535.50 |
| |
Standpipe: Class I or II, per system |
386.00 |
19.30 |
405.30 |
| |
Standpipe: Class III, per system |
1,064.00 |
53.20 |
1,117.20 |
| |
Standpipe: per outlet |
72.00 |
3.60 |
75.60 |
| |
Fire Pump, each |
510.00 |
25.50 |
535.50 |
| |
High-Piled Storage |
1,020.00 |
51.00 |
1,071.00 |
| |
Watermain and Hydrants, per permit |
425.00 |
21.25 |
446.25 |
| |
Watermain and Hydrants, per plug |
17.00 |
0.85 |
17.85 |
| |
Sprinkler System - Residential, per riser |
340.00 |
17.00 |
357.00 |
| |
Sprinkler System - Commercial, per riser |
680.00 |
34.00 |
714.00 |
| |
Sprinkler System, per head |
2.00 |
0.10 |
2.10 |
| |
Monitoring Transmitter |
340.00 |
17.00 |
357.00 |
| |
Underground Fuel Piping System, each |
883.00 |
44.15 |
927.15 |
| |
Sprinkler Supply Main, each |
510.00 |
25.50 |
535.50 |
| |
Fire Extinguishing System, each |
765.00 |
38.25 |
803.25 |
| |
Tank, each |
306.00 |
15.30 |
321.30 |
| |
Vapor Recovery System, per tank |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Plan Re-submittal |
170.00 |
8.50 |
178.50 |
| |
Not Otherwise Listed |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Fire System Inspection - KCC 27.10.350 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Alarm System, per system |
510.00 |
25.50 |
535.50 |
| |
Alarm System, per device |
3.40 |
0.17 |
3.57 |
| |
Emergency Generator, each |
578.00 |
28.90 |
606.90 |
| |
Standpipe: Class I or II, per system |
425.00 |
21.25 |
446.25 |
| |
Standpipe: Class III, per system |
1,170.00 |
58.50 |
1,228.50 |
| |
Standpipe: per outlet |
80.00 |
4.00 |
84.00 |
| |
Fire Pump, each |
510.00 |
25.50 |
535.50 |
| |
High-Piled Storage |
340.00 |
17.00 |
357.00 |
| |
Watermain and Hydrants, per permit |
510.00 |
25.50 |
535.50 |
| |
Watermain and Hydrants, per plug |
37.00 |
1.85 |
38.85 |
| |
Sprinkler System, per riser |
510.00 |
25.50 |
535.50 |
| |
Sprinkler System, per head (max fee for heads per riser = $2,890 + surcharge) |
4.25 |
0.21 |
4.46 |
| |
Monitoring Transmitter |
340.00 |
17.00 |
357.00 |
| |
Underground Fuel Piping System |
1,318.00 |
65.90 |
1,383.90 |
| |
Sprinkler Supply Main, each |
510.00 |
25.50 |
535.50 |
| |
Fire Extinguishing System, each |
765.00 |
38.25 |
803.25 |
| |
Tank, each |
357.00 |
17.85 |
374.85 |
| |
Vapor Recovery System, per tank |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Re-Inspection, each |
217.00 |
10.85 |
227.85 |
| |
Not Otherwise Listed |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Zoning/Site Conditions Review - KCC 27.10.060 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Basic |
680.00 |
34.00 |
714.00 |
| |
School Portable |
595.00 |
29.75 |
624.75 |
| |
Addition or Improvement: Residential |
340.00 |
17.00 |
357.00 |
| |
Addition or Improvement: Tenant |
340.00 |
17.00 |
357.00 |
| |
Addition or Improvement: Multifamily or Commercial |
340.00 |
17.00 |
357.00 |
| |
Addition or Improvement: Change of Use |
1,071.00 |
53.55 |
1,124.55 |
| |
Agricultural Building Outside APD and without Farm Plan |
714.00 |
35.70 |
749.70 |
| |
Agricultural Building in the APD or RA-Zone with Farm Plan |
255.00 |
12.75 |
267.75 |
| |
Already-Built Construction - Commercial |
510.00 |
25.50 |
535.50 |
| |
Already-Built Construction - Residential |
510.00 |
25.50 |
535.50 |
| |
Dwelling - Single Family |
714.00 |
35.70 |
749.70 |
| |
Dwelling - Accessory Dwelling Unit |
510.00 |
25.50 |
535.50 |
| |
Dwelling - Modular Home |
680.00 |
34.00 |
714.00 |
| |
Dwelling - Mobile Home |
595.00 |
29.75 |
624.75 |
| |
Dwelling - Mobile Home with Medical Hardship |
680.00 |
34.00 |
714.00 |
| |
Electronic Communication - Pole/Tower |
1,275.00 |
63.75 |
1,338.75 |
| |
Electronic Communication - Antenna |
850.00 |
42.50 |
892.50 |
| |
Dock |
187.00 |
9.35 |
196.35 |
| |
Pool |
221.00 |
11.05 |
232.05 |
| |
Landscape - Inspection |
782.00 |
39.10 |
821.10 |
| |
Landscape - Maintenance |
833.00 |
41.65 |
874.65 |
| |
All Other Not Listed by Project Type - Simple Review |
425.00 |
21.25 |
446.25 |
| |
All Other Not Listed by Project Type - Complex Review |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Re-submittal, each |
170.00 |
8.50 |
178.50 |
| Fee Definitions 2012 Fee Schedule |
| Fire Flow and Access Review - KCC 27.10.040 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Building with Sprinklers: New Commercial |
510.00 |
25.50 |
535.50 |
| |
Building with Sprinklers: Other Commercial |
340.00 |
17.00 |
357.00 |
| |
Building with Sprinklers: Single Family Dwelling |
170.00 |
8.50 |
178.50 |
| |
Building with Sprinklers: Adult Family Home Conversion |
170.00 |
8.50 |
178.50 |
| |
Building with Sprinklers: Not Otherwise Listed |
170.00 |
8.50 |
178.50 |
| |
Building without Sprinklers |
85.00 |
4.25 |
89.25 |
| |
Agricultural Building in the APD or RA-Zone with Farm Plan |
85.00 |
4.25 |
89.25 |
| |
Re-submittal, each |
85.00 |
4.25 |
89.25 |
| Fee Definitions 2012 Fee Schedule |
| Site Engineering Review - KCC 27.10.080 | 2012 Fee | 5% Surcharge | Total Fees |
| | Plan Review - DDES |
|
|
|
| |
Targeted or Small Site - Basic Review with Standardized Conditions |
714.00 |
35.70 |
749.70 |
| |
Targeted or Small Site - Standard Review, with No Critical Areas Review |
1,275.00 |
63.75 |
1,338.75 |
| |
Targeted or Small Site - Standard Review, Completed CAD, 1 Review |
2,380.00 |
119.00 |
2,499.00 |
| |
Targeted or Small Site - Standard Review, Completed CAD, 2 Reviews |
3,740.00 |
187.00 |
3,927.00 |
| |
Targeted or Small Site - Standard Review, Not Listed Otherwise |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Complex Level 1 |
2,550.00 |
127.50 |
2,677.50 |
| |
Complex Level 2 |
5,100.00 |
255.00 |
5,355.00 |
| |
Complex Level 3 |
7,650.00 |
382.50 |
8,032.50 |
| |
Complex Level 4 |
10,200.00 |
510.00 |
10,710.00 |
| |
Complex Level 5 |
15,300.00 |
765.00 |
16,065.00 |
| |
Complex Level 6 |
20,400.00 |
1,020.00 |
21,420.00 |
| |
Complex Level 7 |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| | Plan Re-Submittal - DDES |
|
|
|
| |
Targeted or Small Site - Basic Review with Standardized Conditions |
382.00 |
19.10 |
401.10 |
| |
Targeted or Small Site - Standard Review, with No Critical Areas Review |
382.00 |
19.10 |
401.10 |
| |
Targeted or Small Site - Standard Review, Completed CAD, 1 Review |
765.00 |
38.25 |
803.25 |
| |
Targeted or Small Site - Standard Review, Completed CAD, 2 Reviews |
1,190.00 |
59.50 |
1,249.50 |
| |
Complex Level 1 |
1,020.00 |
51.00 |
1,071.00 |
| |
Complex Level 2 |
1,530.00 |
76.50 |
1,606.50 |
| |
Complex Level 3 |
2,040.00 |
102.00 |
2,142.00 |
| |
Complex Level 4 |
3,060.00 |
153.00 |
3,213.00 |
| |
Complex Level 5 |
4,080.00 |
204.00 |
4,284.00 |
| |
Complex Level 6 |
5,100.00 |
255.00 |
5,355.00 |
| Fee Definitions 2012 Fee Schedule |
| DOT Road Constructability Review - KCC 27.10.085 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Complex Level 3 |
880.00 |
NA |
880.00 |
| |
Complex Level 4 |
880.00 |
NA |
880.00 |
| |
Complex Level 5 |
1,320.00 |
NA |
1,320.00 |
| |
Complex Level 6 |
1,760.00 |
NA |
1,760.00 |
| |
Complex Level 7 |
$110.00/hour |
NA |
$110.00/hour |
| Fee Definitions 2012 Fee Schedule |
| Road or Drainage Variance Review - KCC 27.10.070 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Road Variance Review - DDES Review |
1,020.00 |
51.00 |
1,071.00 |
| |
Road Variance Review - DDES Review, re-submittal |
340.00 |
17.00 |
357.00 |
| |
Road Variance Review - DOT Review, if needed |
1,650.00 |
NA |
1,650.00 |
| |
Storm Water Manual Adjustment Review - Basic |
1,870.00 |
93.50 |
1,963.50 |
| |
Storm Water Manual Adjustment Review - Complex |
3,910.00 |
195.50 |
4,105.50 |
| |
Storm Water Manual Adjustment Review - Experimental |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Clearing or Grading Permit - KCC 27.10.090 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Minor: < 2,000="" square="" feet="" grading,="">< 7,000="" square="" feet=""> |
340.00 |
17.00 |
357.00 |
| |
Hazard Tree Removal: 1 - 10 |
340.00 |
17.00 |
357.00 |
| |
Hazard Tree Removal: 11 - 20 |
468.00 |
23.40 |
491.40 |
| |
Residential: <= 0.2="">/td> |
425.00 |
21.25 |
446.25 |
| |
Residential: 0.21 - 1.0 Acres |
680.00 |
34.00 |
714.00 |
| |
Farm Pad: Less than 2,000 SF in APD or RA-zoned with Farm Plan |
170.00 |
8.50 |
178.50 |
| |
Farm Pad: Between 2,000 and 10,000 SF in APD or RA-zoned with Farm Plan |
340.00 |
17.00 |
357.00 |
| |
Agricultural Activity - Drainage Maintenance with Best Management Practices |
340.00 |
17.00 |
357.00 |
| |
All Other Not Listed |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Clearing or Grading Plan Review - KCC 27.10.090 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Plan Review: <= 0.2="">/td> |
595.00 |
29.75 |
624.75 |
| |
Plan Review: 0.21 - 1.0 Acres |
1,445.00 |
72.25 |
1,517.25 |
| |
Plan Review: 1.01 - 5.0 Acres |
2,720.00 |
136.00 |
2,856.00 |
| |
Plan Review: 5.01 - 10.0 Acres |
3,570.00 |
178.50 |
3,748.50 |
| |
Plan Review: 10.01 - 20.0 Acres |
5,270.00 |
263.50 |
5,533.50 |
| |
Plan Review: > 20 Acres |
6,970.00 |
348.50 |
7,318.50 |
| |
Plan Revision - Minor |
595.00 |
29.75 |
624.75 |
| |
Plan Revision - Major |
new app fee |
|
|
| Fee Definitions 2012 Fee Schedule |
| Forest Practices and Mining Review and Inspection - KCC 27.10.090 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Class IV Conversion - Residential |
595.00 |
29.75 |
624.75 |
| |
Class IV Conversion - Non-Residential |
1,190.00 |
59.50 |
1,249.50 |
| |
Conversion Option Harvest Plan - 0 to 10 acres |
1,530.00 |
76.50 |
1,606.50 |
| |
Conversion Option Harvest Plan - 10.01 to 20 acres |
2,720.00 |
136.00 |
2,856.00 |
| |
Conversion Option Harvest Plan - More than 20 acres |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Release of Moratorium (not including engineering or critical area review) |
5,100.00 |
255.00 |
5,355.00 |
| |
Forest Management Activities with Approved Forest Mgmt Plan - 5 acres or less |
170.00 |
8.50 |
178.50 |
| |
Forest Management Activities with Approved Forest Mgmt Plan - More than 5 acres |
425.00 |
21.25 |
446.25 |
| |
Surface Mine and Processing Facility Review |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Right of Way Use Review - KCC27.10.120 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Minor Repair, Maintenance, Drainage Improvements |
340.00 |
17.00 |
357.00 |
| |
Utility Crossing or Minor Driveway Construction - Review |
1,275.00 |
63.75 |
1,338.75 |
| |
Utility Crossing or Minor Driveway Construction - Re-submittal, each |
340.00 |
17.00 |
357.00 |
| |
Not Otherwise Listed |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Critical Area Review and Inspection - KCC 27.10.130 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Residential - Per Site Visit |
374.00 |
18.70 |
392.70 |
| |
Residential - Review: Basic |
765.00 |
38.25 |
803.25 |
| |
Residential - Review: Complex with Preferred Consultant, Level 1 |
1,020.00 |
51.00 |
1,071.00 |
| |
Residential - Review: Complex with Preferred Consultant, Level 2 |
2,380.00 |
119.00 |
2,499.00 |
| |
Residential - Review: Complex with Other Consultant, or Exception |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Non-Residential - Per Site Visit |
374.00 |
18.70 |
392.70 |
| |
Non-Residential - Review: Basic, per Discipline |
935.00 |
46.75 |
981.75 |
| |
Non-Residential - Review: Complex or Exception |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Revisions |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Exceptions and Variances (KCC 27.10.140) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Flood Elevation Certification - Review |
1,020.00 |
51.00 |
1,071.00 |
| |
Flood Elevation Certification - Resubmittal |
340.00 |
17.00 |
357.00 |
| |
Letter-of-Map-Amendment Community Acknowledgement |
850.00 |
42.50 |
892.50 |
| |
Flood Inquiry - Basic |
170.00 |
8.50 |
178.50 |
| |
Flood Inquiry - Complex |
340.00 |
17.00 |
357.00 |
| Fee Definitions 2012 Fee Schedule |
| Critical Area Inquiries/Designations - KCC 27.10.130 | 2012 Fee | 5% Surcharge | Total Fees |
| |
No Areas Found |
510.00 |
25.50 |
535.50 |
| |
Only Critical Aquifer Recharge Area, Seismic Hazard and/or Erosion Hazard |
510.00 |
25.50 |
535.50 |
| |
5 Acres or Less with 1 Critical Area |
935.00 |
46.75 |
981.75 |
| |
5 Acres or Less with 2 Critical Areas |
1,445.00 |
72.25 |
1,517.25 |
| |
5 Acres or Less with 3 Critical Areas |
1,785.00 |
89.25 |
1,874.25 |
| |
5-10 Acres with 1 Critical Area |
1,190.00 |
59.50 |
1,249.50 |
| |
5-10 Acres with more than 1 Critical Area |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Extension of Approval |
382.00 |
19.10 |
401.10 |
| |
All Other Not Listed |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Miscellaneous Review and Inspection: Zoning and Environmental | 2012 Fee | 5% Surcharge | Total Fees |
| |
SEPA Review - Minor New Construction, Clearing or Grading (KCC 27.10.150) |
850.00 |
42.50 |
892.50 |
| |
SEPA Review - Not Otherwise Listed or Supplemental (KCC 27.10.150) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
EIS Preparation (KCC 27.10.150) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Shoreline Exemption - Repair and Maintenance (KCC 27.10.160) |
510.00 |
25.50 |
535.50 |
| |
Shoreline Exemption - Timber Harvest in Forest Production District (KCC 27.10.160) |
340.00 |
17.00 |
357.00 |
| |
Shoreline Exemption - In APD or RA-Zone with Farm Plan (KCC 27.10.160) |
340.00 |
17.00 |
357.00 |
| |
Shoreline Exemption - All Others (KCC 27.10.160) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Shoreline Development Application (KCC 27.10.160) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Conditional Use Permit - Residential, Home Industry, Tower (KCC 27.10.170) |
5,100.00 |
255.00 |
5,355.00 |
| |
Critical Area Alteration or Reasonable Use Exception - Residential (KCC 27.10.170) |
5,100.00 |
255.00 |
5,355.00 |
| |
Critical Area Alteration or Reasonable Use Exception - Extension (KCC 27.10.170) |
765.00 |
38.25 |
803.25 |
| |
Transfer of Development Rights Sending Site Certification (KCC 27.10.170) |
364.00 |
18.20 |
382.20 |
| |
Other Zoning Application Review, Variances, Exceptions Not Listed (KCC 27.10.170) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Site-Specific Map, Plan, or Code Amendment (KCC 27.10.180) |
1,500.00 |
75.00 |
1,575.00 |
| Fee Definitions 2012 Fee Schedule |
| Binding Site Plan - KCC 27.10.190 and 200 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Preliminary Plan Review and Approval |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Final Plan Review - Small to Moderate Size |
7,480.00 |
374.00 |
7,854.00 |
| |
Final Plan Resubmittal - Small to Moderate Size |
1,360.00 |
68.00 |
1,428.00 |
| |
Final Plan Approval - Small to Moderate Size |
1,700.00 |
85.00 |
1,785.00 |
| |
Final Plan Review and Approval - Complex |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Extension of Approval |
212.00 |
10.60 |
222.60 |
| Fee Definitions 2012 Fee Schedule |
| Urban Planned Development - KCC 27.10.190 and 200 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Preliminary Plan Review and Approval |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Final Plan Review and Approval |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Extension of Approval |
212.00 |
10.60 |
222.60 |
| Fee Definitions 2012 Fee Schedule |
| Subdivision - KCC 27.10.190 and 200 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Preliminary Plan Review and Approval |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Final Plan Review - Up to 25 lots |
7,480.00 |
374.00 |
7,854.00 |
| |
Final Plan Resubmittal - Up to 25 lots |
1,360.00 |
68.00 |
1,428.00 |
| |
Final Plan Approval - Up to 25 lots |
1,700.00 |
85.00 |
1,785.00 |
| |
Final Plan Review and Approval - More Than 25 Lots |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Extension of Approval |
212.00 |
10.60 |
222.60 |
| |
Legal Description, 1-50 Lots - Base Fee |
340.00 |
17.00 |
357.00 |
| |
Legal Description, 1-50 Lots - Per Lot |
102.00 |
5.10 |
107.10 |
| |
Legal Description, 51-100 Lots - Base Fee |
5,440.00 |
272.00 |
5,712.00 |
| |
Legal Description, 51-100 Lots - Per Lot |
40.00 |
2.00 |
42.00 |
| |
Legal Description, More Than 100 Lots - Base Fee |
7,440.00 |
372.00 |
7,812.00 |
| |
Legal Description, More Than 100 Lots - Per Lot |
10.00 |
0.50 |
10.50 |
| Fee Definitions 2012 Fee Schedule |
| Short Plat - KCC 27.10.190 and 200 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Preliminary Plan Review and Approval |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Final Plan Review - Urban, 2-4 Lots, Simple |
3,655.00 |
182.75 |
3,837.75 |
| |
Final Plan Review - Urban, 2-4 Lots, Complex |
5,100.00 |
255.00 |
5,355.00 |
| |
Final Plan Review - Urban, 5-9 Lots |
7,480.00 |
374.00 |
7,854.00 |
| |
Final Plan Review - Rural |
5,100.00 |
255.00 |
5,355.00 |
| |
Final Plan Resubmittal |
1,360.00 |
68.00 |
1,428.00 |
| |
Final Plan Approval - Urban, 2-4 Lots, Simple |
595.00 |
29.75 |
624.75 |
| |
Final Plan Approval - Urban, 2-4 Lots, Complex |
850.00 |
42.50 |
892.50 |
| |
Final Plan Approval - Urban, 5-9 Lots |
1,700.00 |
85.00 |
1,785.00 |
| |
Final Plan Approval - Rural |
850.00 |
42.50 |
892.50 |
| |
Extension of Approval |
212.00 |
10.60 |
222.60 |
| Fee Definitions 2012 Fee Schedule |
| Miscellaneous Land Division - KCC 27.10.210 and 220 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Innocent Purchaser - Review |
629.00 |
31.45 |
660.45 |
| |
Innocent Purchaser - Resubmittal |
170.00 |
8.50 |
178.50 |
| |
Separate Lot - Platted Lots - Review |
884.00 |
44.20 |
928.20 |
| |
Separate Lot - Platted Lots - Resubmittal |
340.00 |
17.00 |
357.00 |
| |
Separate Lot - Non-Platted Lots, Minimum Review Fee for One Lot |
884.00 |
44.20 |
928.20 |
| |
Separate Lot - Non-Platted Lots, Review per Additional Lot |
510.00 |
25.50 |
535.50 |
| |
Separate Lot - Non-Platted Lots - Resubmittal |
340.00 |
17.00 |
357.00 |
| |
Miscellaneous Lot Exemption - Review |
1,734.00 |
86.70 |
1,820.70 |
| |
Miscellaneous Lot Exemption - Resubmittal |
340.00 |
17.00 |
357.00 |
| |
Boundary Line Adjustment - Basic, Review |
2,448.00 |
122.40 |
2,570.40 |
| |
Boundary Line Adjustment - Basic, Resubmittal, each |
680.00 |
34.00 |
714.00 |
| |
Boundary Line Adjustment - Complex, Review |
3,808.00 |
190.40 |
3,998.40 |
| |
Boundary Line Adjustment - Complex, Resubmittal, each |
1,020.00 |
51.00 |
1,071.00 |
| |
Boundary Line Adjustment - Final Mylar Approval for Recording Only |
680.00 |
34.00 |
714.00 |
| |
Lot Merger - Review |
850.00 |
42.50 |
892.50 |
| |
Lot Merger - Resubmittal, each |
340.00 |
17.00 |
357.00 |
| Fee Definitions 2012 Fee Schedule |
| Fire Safety Inspection - KCC 27.10.360 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Annual Inspection |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Fireworks Stand ($150 clean-up deposit also required) |
100.00 |
NA |
100.00 |
| |
Fireworks Display ($150 clean-up deposit also required) |
500.00 |
NA |
500.00 |
| |
Liquified Petroleum Gas Serving Single Family Residences |
no charge |
NA |
no charge |
| |
Parade Floats |
no charge |
NA |
no charge |
| |
Ceremonial Candle Use by Churches or Non-Profits |
no charge |
NA |
no charge |
| Fee Definitions 2012 Fee Schedule |
| Site Development Inspection by DDES - KCC 27.10.380 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Residential Building Site Less Than One Acre Disturbance Without Engineered Plan |
510.00 |
25.50 |
535.50 |
| |
Other Small Construction Site Less Than One Acre Without Engineered Plan - per inspection |
510.00 |
25.50 |
535.50 |
| | Complex Project - Each Month of Active Construction |
|
|
|
| |
Complex Level 1 |
680.00 |
34.00 |
714.00 |
| |
Complex Level 2 |
1,020.00 |
51.00 |
1,071.00 |
| |
Complex Level 3 |
1,360.00 |
68.00 |
1,428.00 |
| |
Complex Level 4 |
1,700.00 |
85.00 |
1,785.00 |
| |
Complex Level 5 |
2,040.00 |
102.00 |
2,142.00 |
| |
Complex Level 6 |
2,550.00 |
127.50 |
2,677.50 |
| | Complex Project - Each Month of Without Construction Activity |
|
|
|
| |
Complex Level 1 |
85.00 |
4.25 |
89.25 |
| |
Complex Level 2 |
85.00 |
4.25 |
89.25 |
| |
Complex Level 3 |
170.00 |
8.50 |
178.50 |
| |
Complex Level 4 |
255.00 |
12.75 |
267.75 |
| |
Complex Level 5 |
340.00 |
17.00 |
357.00 |
| |
Complex Level 6 |
340.00 |
17.00 |
357.00 |
| |
Complex Level 7 |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| | Annual Monitoring of Mining and Industrial Uses (in addition to annual permit extension fee) |
|
|
|
| |
Inactive Site |
no charge |
NA |
no charge |
| |
Semi-active Sites - 20 acres or less |
680.00 |
34.00 |
714.00 |
| |
Semi-active Sites - More Than 20 Acres |
2,720.00 |
136.00 |
2,856.00 |
| |
Active Sites - 20 acres or less |
2,720.00 |
136.00 |
2,856.00 |
| |
Active Sites - More Than 20 Acres |
6,800.00 |
340.00 |
7,140.00 |
| |
Review of Changes to Approved Plan |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Re-Inspection for Non-Bonded Actions, each |
425.00 |
21.25 |
446.25 |
| Fee Definitions 2012 Fee Schedule |
| Site Development Inspection by DNRP - KCC 27.10.390 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Pre-Construction Meeting and Inspection of Stormwater Facilities - One Facility Site |
1,320.00 |
NA |
1,320.00 |
| |
Inspection of Stormwater Facilities - Each Additional Facility Site |
660.00 |
NA |
660.00 |
| Fee Definitions 2012 Fee Schedule |
| Site Development Inspection by DOT - KCC 27.10.400 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Complex Level 1 |
440.00 |
NA |
440.00 |
| |
Complex Level 2 |
440.00 |
NA |
440.00 |
| |
Complex Level 3 |
5,500.00 |
NA |
5,500.00 |
| |
Complex Level 4 |
6,600.00 |
NA |
6,600.00 |
| |
Complex Level 5 |
9,680.00 |
NA |
9,680.00 |
| |
Complex Level 6 |
14,520.00 |
NA |
14,520.00 |
| |
Complex Level 7 |
$110.00/hour |
NA |
$110.00/hour |
| |
Permit Revision, Re-inspection, or Supplemental Inspection |
$110.00/hour |
NA |
$110.00/hour |
| Fee Definitions 2012 Fee Schedule |
| Land Use Monitoring and Inspection - KCC 27.10.410 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Zoning, SEPA, Critical Area, or Shoreline Condition Inspection, each - Residential |
297.00 |
14.85 |
311.85 |
| |
Zoning, SEPA, Critical Area, or Shoreline Condition Inspection, each - Other |
552.00 |
27.60 |
579.60 |
| |
Critical Area Mitigation Installation |
382.00 |
19.10 |
401.10 |
| |
Critical Area Mitigation Monitoring - 3 to 5 Years |
1,317.00 |
65.85 |
1,382.85 |
| |
Critical Area Mitigation Monitoring - More Than 5 Years |
2,635.00 |
131.75 |
2,766.75 |
| Fee Definitions 2012 Fee Schedule |
| Permit Extension - KCC 27.10.420 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Building Permit - Single Family Residential, Final Inspection Only |
301.00 |
15.05 |
316.05 |
| |
Building Permit - Single Family Residential, More Than Final Inspection |
423.00 |
21.15 |
444.15 |
| |
Building Permit - Temporary Mobile Home |
217.00 |
10.85 |
227.85 |
| |
Building Permit - Temporary Mobile Home Medical Hardship |
133.00 |
6.65 |
139.65 |
| |
Building Permit - All Other, Final Inspection Only |
423.00 |
21.15 |
444.15 |
| |
Building Permit - All Other, More Than Final Inspection |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Mechanical Permits - Single Family Residential |
133.00 |
6.65 |
139.65 |
| |
Mechanical Permits - All Other, Final Inspection Only |
241.00 |
12.05 |
253.05 |
| |
Mechanical Permits - All Other, Full System Inspection |
20% of original permit, including the 5% surcharge |
|
|
| |
Fire System Permits - Single Family Residential |
151.00 |
7.55 |
158.55 |
| |
Fire System Permits - All Other, Final and Correction |
241.00 |
12.05 |
253.05 |
| |
Fire System Permits - All Other, Full System Inspection |
20% of original permit, including the 5% surcharge |
|
|
| |
Sign Permits |
151.00 |
7.55 |
158.55 |
| |
Temporary Use Permit - One-Year Renewal |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Conditional Use |
170.00 |
8.50 |
178.50 |
| |
Shoreline |
170.00 |
8.50 |
178.50 |
| |
Clearing or Grading - Residential |
212.00 |
10.60 |
222.60 |
| |
Clearing or Grading - Non-Residential |
382.00 |
19.10 |
401.10 |
| |
Clearing or Grading - Industrial |
892.00 |
44.60 |
936.60 |
| |
Right of Way Use |
212.00 |
10.60 |
222.60 |
| Fee Definitions 2012 Fee Schedule |
| Investigation of Work Done Without Permit - KCC 27.10.470 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Building Construction, including fire, mechanical or sign |
Regular Fee |
0.05 |
|
| |
Site Work - Minor Clearing or Grading |
213.00 |
10.65 |
223.65 |
| |
Site Work - Clearing 1 to 10 Hazard Trees |
213.00 |
10.65 |
223.65 |
| |
Site Work - Clearing 11 to 20 Hazard Trees |
425.00 |
21.25 |
446.25 |
| |
Site Work - Residential Development |
595.00 |
29.75 |
624.75 |
| |
Site Work - Non-Residential Development |
1,190.00 |
59.50 |
1,249.50 |
| |
Right of Way Use |
595.00 |
29.75 |
624.75 |
| Fee Definitions 2012 Fee Schedule |
| Appeals - KCC 20.24.450 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Building Permit |
250.00 |
NA |
250.00 |
| |
Land Use Application |
250.00 |
NA |
250.00 |
| |
Fee Estimate |
50.00 |
NA |
50.00 |
| |
Fee Notice of Completion |
50.00 |
NA |
50.00 |
| |
Fee Waiver or Billing |
50.00 |
NA |
50.00 |
| Fee Definitions 2012 Fee Schedule |
| Miscellaneous Services | 2012 Fee | 5% Surcharge | Total Fees |
| |
Addressing Requests: Residential without Site Visit, per address (KCC 27.02.170) |
136.00 |
6.80 |
142.80 |
| |
Addressing Requests: Other (KCC 27.02.170) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Affidavit - Modification of Recorded Building Envelope (KCC 27.10.210) |
1,020.00 |
51.00 |
1,071.00 |
| |
Affidavit - Modification - Re-submittal (KCC 27.10.210) |
340.00 |
17.00 |
357.00 |
| |
Affidavit - Name Change (KCC 27.10.210) |
241.00 |
12.05 |
253.05 |
| |
Certification of Compliance or Completion - Individual Condo or Part of Building (KCC 27.10.510) |
157.00 |
7.85 |
164.85 |
| |
Certification of Compliance or Completion - Multiple Buildings per Permit (KCC 27.10.510) |
344.00 |
17.20 |
361.20 |
| |
Certification of Compliance or Completion - Shell Construction (KCC 27.10.510) |
344.00 |
17.20 |
361.20 |
| |
Certification of Compliance or Completion - Temporary Occupancy (KCC 27.10.510) |
344.00 |
17.20 |
361.20 |
| |
Code Interpretation (KCC 2.100.070) |
250.00 |
12.50 |
262.50 |
| |
Condo Conversion - Review (KCC 27.10.460) |
1,530.00 |
76.50 |
1,606.50 |
| |
Condo Conversion - Resubmittal (KCC 27.10.460) |
340.00 |
17.00 |
357.00 |
| |
Duplicate Certificate of Elevation (KCC 27.02.160) |
212.00 |
10.60 |
222.60 |
| |
Expedited Review (KCC 27.02.090) |
$255.00/hour |
$12.75/hour |
$267.75/hour |
| |
Financial Guarantees - Monitoring, Inspection, Enforcement by DDES (KCC 27.02.080) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Financial Guarantees - Processing by DNRP or DOT (KCC 27.02.085) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Financial Guarantees - Setting, Intake, Release by DDES (KCC 27.02.080) |
230.00 |
11.50 |
241.50 |
| |
Pre-Issuance Authorization Building and Site Inspection (KCC 27.10.550) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| |
Pre-Issuance Authorization Processing and Review (KCC 27.10.550) |
1,200.00 |
60.00 |
1,260.00 |
| |
Tank Removal Contractor Annual Certification (KCC 27.02.160) |
170.00 |
8.50 |
178.50 |
| |
Title Elimination (KCC 27.02.160) |
60.00 |
3.00 |
63.00 |
| |
Zoning Certification Letter: Confirmation of Existing Zoning Designation and/or Development Rights (KCC 27.02.160) |
170.00 |
8.50 |
178.50 |
| |
Zoning Certification Letter - All Other Inquiries or Certification Requiring Historic Research or Follow-up Information Review (KCC 27.02.160) |
510.00 |
25.50 |
535.50 |
| |
Other Services Not Listed (KCC 27.02.100) |
$170.00/hour |
$8.50/hour |
$178.50/hour |
| Fee Definitions 2012 Fee Schedule |
| Business Licenses | 2012 Fee | 5% Surcharge | Total Fees |
| |
Amusement Devices - Novelty, per year (KCC 6.04.040) |
100.00 |
NA |
100.00 |
| |
Amusement Devices - Shuffleboard, per year (KCC 6.04.040) |
50.00 |
NA |
50.00 |
| |
Amusement Places - Permanent Park, 1-10 units (KCC 6.04.020) |
200.00 |
NA |
200.00 |
| |
Amusement Places - Permanent Park, more than 10 units (KCC 6.04.020) |
400.00 |
NA |
400.00 |
| |
Amusement Places - Carnival, 1-10 units, per day (KCC 6.04.020) |
40.00 |
NA |
40.00 |
| |
Amusement Places - Carnival, more than 10 units, per day (KCC 6.04.020) |
100.00 |
NA |
100.00 |
| |
Amusement Places - Other, per year (KCC 6.04.020) |
200.00 |
NA |
200.00 |
| |
Amusement Places - Other, per 6 months (KCC 6.04.020) |
100.00 |
NA |
100.00 |
| |
Amusement Places - Other, per day (KCC 6.04.020) |
50.00 |
NA |
50.00 |
| |
Dances, one year (KCC 6.20.080) |
200.00 |
NA |
200.00 |
| |
Dances, 6 months (KCC 6.20.080) |
100.00 |
NA |
100.00 |
| |
Dances, one night (KCC 6.20.080) |
50.00 |
NA |
50.00 |
| |
Charitable Solicitation - unpaid solicitors (KCC 6.76.080) |
40.00 |
NA |
40.00 |
| |
Charitable Solicitation - paid solicitors (KCC 6.76.080) |
1,000.00 |
NA |
1,000.00 |
| |
Charitable Solicitation - appeal (KCC 6.76.080) |
10.00 |
NA |
10.00 |
| |
Junk Shop (KCC 6.36.030) |
300.00 |
NA |
300.00 |
| |
Junk Wagon (KCC 6.36.030) |
40.00 |
NA |
40.00 |
| |
Massage Parlor (KCC 6.40.070) |
150.00 |
NA |
150.00 |
| |
Public Bathhouse (KCC 6.40.070) |
150.00 |
NA |
150.00 |
| |
Massage Practitioner (KCC 6.40.070) |
50.00 |
NA |
50.00 |
| |
Massage Parlor - Late Penalty (KCC 6.40.070) |
15.00 |
NA |
15.00 |
| |
Public Bathhouse - Late Penalty (KCC 6.40.070) |
15.00 |
NA |
15.00 |
| |
Massage Practitioner - Late Penalty (KCC 6.40.070) |
5.00 |
NA |
5.00 |
| |
Outdoor Musical Entertainments - per event (KCC 6.52.030) |
750.00 |
NA |
750.00 |
| |
Pawnbrokers (KCC 6.52.030) |
500.00 |
NA |
500.00 |
| |
Second-hand Dealers (KCC 6.60.030) |
40.00 |
NA |
40.00 |
| |
Shooting Ranges (KCC 6.84.060) |
50.00 |
NA |
50.00 |
| |
Adult Entertainment - Manager (KCC 6.09.100) |
75.00 |
NA |
75.00 |
| |
Adult Entertainment - Entertainer (KCC 6.09.100) |
75.00 |
NA |
75.00 |
| |
Adult Entertainment - Replacement License (KCC 6.09.100) |
15.00 |
NA |
15.00 |
| Fee Definitions 2012 Fee Schedule |
| School MPS Payment Processing Fees - KCC 21A.43.090 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Administration - DDES |
52.00 |
NA |
52.00 |
| |
Administration - FBOD |
13.00 |
NA |
13.00 |
| Fee Definitions 2012 Fee Schedule |
| Roads MPS Payment Processing Fees - KCC 14.75.080 | 2012 Fee | 5% Surcharge | Total Fees |
| |
Traffic Model, per run |
320.00 |
NA |
320.00 |
| |
Administration - DDES |
26.00 |
NA |
26.00 |
| |
Administration - Roads |
34.00 |
NA |
34.00 |
| |
Deferral - per Plat, Short Plat, Binding Site Plan, PUD |
250.00 |
NA |
250.00 |
| |
Deferral - per Building Permit |
85.00 |
NA |
85.00 | |