Project summaryThis project provided Phase I problem identification and preventative maintenance (PM) investigation, analysis and energized system analysis. Included: a TEGG report, light level analysis, infrared testing, minor PM repairs and preparation of the report. This project included energized testing, first year testing / inspection, cleaning / tightening, lubricating. Phase II includes schematic level analysis of Major Systems replacement and upgrades (cost to be determined).Project schedule
Project budget$20,350Staff contact