Puget Sound shoreline next to the West Point Treatment Plant, Seattle

Puget Sound Beach CSO Control projects

Back to Library

Technical information

February 2011 Update: Draft Facility Plans (Barton and MurrayNorth Beach and South Magnolia) are now posted. All Facility Plans will be approved in summer 2011.

Technical information documents include supporting information and materials used to develop and evaluate CSO control approaches and alternatives for the Barton, Murray, North Beach, and South Magnolia project areas. Documents were generated or compiled from previous sources beginning in early 2007. Documentation of the selection process extended through 2010 when a preferred proposal was recommended for each project area.

A PDF Reader is required to view PDF files linked off of this page. The PDF file sizes have been reduced as much as possible, but some of the files are very large. Contact the Beach CSO Control project team if you would like CD versions of these documents.

General

Documents related the authorization of the CSO beach projects; technical analysis of Green Storm Water Infrastructure; CSO Control Program engineering studies and analysis.

Document Status
Capital Project Transfer (CPTR) Transfer Document to Major Capital Projects (MCIP): Combined Sewer Overflow Projects: Barton CSO Facility, Magnolia CSO Facility, Murray CSO Facility and North Beach Pump Station & CSO Facility, May 16, 2006 Posted June 11, 2010

Demand Management Green Stormwater Infrastructure (GSI)

Posted June 11, 2010

General Technical

Posted June 11, 2010

* Posted June 21, 2010

** Posted Sept. 29, 2010

> Back to top of page

CSO Beach Projects Document Binders

The CSO Beach projects document binders are intended to include materials developed as part of creation and evaluation of CSO control approaches and alternatives beginning in early 2007 and culminating in the selection of a preferred project alternative, currently scheduled for 2010. As of this date, this document includes materials developed by the project team from March 2007 through February 2010. At the end of February 2010, the project team evaluated nine alternatives and selected three alternatives from that group for refinement in 2010. As of February 2010, that work is ongoing. When the process to select a preferred alternative is completed in 2010, documentation for this phase of the work will be added to this document.

Binder 1. Alternatives Evaluation Process

Describes the process used in all four basins for the identification and evaluation of alternatives against a range of factors.

Document Status

Alternatives Development and Screening Process Overview, Feb. 19, 2010

Posted June 16, 2010

TM 202.1 CSO Control Approach and Planning Boundaries, Final Draft, December 2007 (57MB)

Posted June 16, 2010
TM 203.1 Barton, Murray , Magnolia, and North Beach facility selection Criteria, August 1, 2007 Posted June 16, 2010

Memos:

Posted June 16, 2010
Alternative Analysis Draft Criteria Posted June 16, 2010
CSO Control Facility Component Figures and Basic Design Criteria Posted June 16, 2010
CSO Team Review Comment Posted June 16, 2010
CSO Team meeting and workshop notes, August - December 2009 Posted June 16, 2010

> Back to binder list | top of page

Binder 2. Basins Hydrologic/Hydraulic Model

> Back to binder list | top of page

Binder 3. Alternative Basis of Costs and Cost Estimates

Document Status
Binder index Posted Aug. 3, 2010
Basis of Cost, Dec. 7, 2009 Posted Aug. 3, 2010
Barton Capital and Life Cycle Cost Posted Aug. 3, 2010
Murray Capital and Life Cycle Cost Posted Aug. 3, 2010
Magnolia Capital and Life Cycle Cost Posted Aug. 3, 2010
North Beach Capital and Life Cycle Cost Posted Aug. 3, 2010

> Back to binder list | top of page

Binder 4. Barton Summary of Alternatives Development Process

Document Status

Introduction

Posted July 13, 2010

Introduction and Basis of Project

Posted July 13, 2010 

Early Planning Confirmation

Posted July 13, 2010

Flow Monitoring Results

Posted July 13, 2010

Initial Nine Alternatives

Posted July 13, 2010

Development and Refinement of Three Alternatives - Refer to the Barton and Murray CSO Control Facilities Plan

Selection of Preferred Alternative - Refer to the Barton and Murray CSO Control Facilities Plan

> Back to binder list | top of page

Binder 5. Murray Summary of Alternatives Development Process

Document Status

Introduction

Posted June 11, 2010

Introduction and Basis of Project

Posted June 11, 2010

Early Planning Confirmation

Posted June 11, 2010

Flow Monitoring Results

Posted June 11, 2010

Initial Nine Alternatives

Posted June 11, 2010

Development and Refinement of Three Alternatives - Refer to the Barton and Murray CSO Control Facilities Plan

Selection of Preferred Alternative - Refer to the Barton and Murray CSO Control Facilities Plan

> Back to binder list | top of page

Binder 6. Magnolia Summary of Alternatives Development Process

Document Status

Introduction

Posted July 15, 2010

Introduction and Basis of Project

Posted July 15, 2010

Early Planning Confirmation

Posted July 15, 2010

Flow Monitoring Results

Posted July 15, 2010

Initial Nine Alternatives

Posted July 15, 2010

Development and Refinement of Three Alternatives - Refer to the South Magnolia CSO Control Engineering Report (Facility Plan)

Selection of Preferred Alternative - Refer to the South Magnolia CSO Control Engineering Report (Facility Plan)

> Back to binder list | top of page

Binder 7. North Beach Summary of Alternatives Development Process

Document Status

Introduction

Posted June 25, 2010

* Posted June 30, 2010

Introduction and Basis of Project

Posted June 11, 2010

Early Planning Confirmation

Posted June 11, 2010

Flow Monitoring Results

Posted June 11, 2010

* Posted June 30, 2010

Initial Nine Alternatives

Posted June 25, 2010

* Posted July 2, 2010

Development and Refinement of Three Alternatives - Refer to the North Beach CSO Control Facility Plan

Selection of Preferred Alternative - Refer to the North Beach CSO Control Facility Plan

> Back to binder list | top of page

Basin Specific Additional Engineering and Technical Documents

Additional basin specific documents that are not already included in the binders.

North Seattle basins (South Magnolia and North Beach)

Document Status
North Beach Inflow and Infiltration Alternative Analysis, Project memo, May 18, 2010 Posted June 17, 2010
North Beach Pump System Test, Nov. 3, 2009 Posted June 17, 2010
North Beach Force main Inspection report, May 31, 1989 - 16MB Posted June 17, 2010
North Beach Pump Station Overflow Control Predesign Report Posted June 17, 2010
Infiltration Inflow Analysis Carkeek Park System, August, 1979 Posted June 17, 2010

Infiltration/Inflow Analysis Facility Plan for the Carkeek Transfer/CSO Facilities Project, December, 1988

Posted June 17, 2010
North Beach Force Main and Carkeek Park Outfall One-line maps of the conveyance system Posted June 29, 2010
South Magnolia Interceptor One-lines maps of the conveyance system Posted June 29, 2010

West Seattle basins (Murray and Barton)

Document Status

Modeling for Combined Sewer Overflow (CSO) Control in the Murray Basin, Draft for Discussion, Aug. 3, 2010
Supplemental documents provided to Murray Citizen Advisory Group on two CDs:

  • Disc 1 (ZIP file)
    • Rainfall Data for Murray Basin Modeling - City of Seattle rain gauges # 5 and #14 to calibrate the Murray basin
    • Flow Meter Data for the Murray Basin Modeling -- The data from the flow meters and the Murray Avenue pump station that was used to calibrate the model
  • Disc 2
    • Murray Basin Flow Meter Data (Excel file) -- Meters in the Murray basin were used to assess how much flow was coming from various parts of the Murray basin. They were not used for sizing the 1 -year storage volume at the pump station
Posted Aug. 17, 2010
Barton and Murray Pump Stations and Surrounding Conveyance, Feb. 2006 Posted June 17, 2010
Barton and Murray One-lines maps of the conveyance system Posted June 17, 2010

> Back to top of page

Related information

Technical information sessions held in June and August 2010

Barton Basin technical information meeting
Meeting topic: discuss Green Stormwater Infrastructure option for CSO control in Barton Basin
Thurs., Aug. 5, 2010
6 p.m. - 8 p.m.
The Hall at Fauntleroy,
9131 California Ave SW, Seattle, WA 98136

Greenstormwater infrastructure (GSI) presentation (PDF), August 5, 2010 
Note: Meeting agenda and handouts are posted on the meeting calendar page.

Related technical documents

North Beach Basin technical information session
Sat., June 26, 2010
10 a.m. - 2 p.m.
Loyal Heights Community Center,
2101 NW 77th St., Seattle

Meeting agenda, handouts, presentation and summary are posted on the meeting calendar page.

Related technical documents

Murray Basin technical information session
Sat., June 19, 2010
9:30 a.m. - 4 p.m.
Gatewood Elementary School,
4320 SW Myrtle St., Seattle

Meeting agenda, handouts, presentation and summary are posted on the meeting calendar page.

Related technical documents