Brightwater Final Supplemental Environmental Impact Statement King County has prepared this Final Supplemental Environmental Impact Statement (Final Supplemental EIS) on the Brightwater Regional Wastewater Treatment System. The Final Supplemental EIS is a supplement to the Final EIS issued in November 2003. The PDF file sizes have been reduced as much as possible (and figure files are provided individually), but some of the files are still large and may be hard to download with a modem connection. Contact the Brightwater project team if you would like hard copy or CD versions of this document. A 16-page summary (2 MG) of the Final Supplemental EIS is also available. The Final Supplemental EIS includes: - comments made on the Draft Supplemental EIS and responses to comments
- changes made to pages in the Draft Supplemental EIS, organized by chapter and appendix
- updated cover letter, foreword, fact sheet, acronyms and abbreviations, glossary, and distribution list; and errata sheet
- the two-volume Draft Supplemental EIS, issued April 11, 2005
Final Supplemental EIS Cover Letter (32KB) Foreword (17KB) Fact Sheet (67KB) Acronyms and Abbreviations (19KB) Table of Contents (20KB) Summary Responses to Comments (220KB) Individual Responses to Comments (22.4MG) Government Agencies, Organizations, Individuals Changes in the Supplemental EIS Text Made in Response to Comments (5.6MG) Foreward Chapter 1 Chapter 2 Chapter 3 Chapter 4 Chapter 5 Appendix G (added) Glossary (84KB) Distribution List (28KB) Errata (28KB) The May 4, 2005, Public Hearing transcript (56KB) Draft Supplemental EIS, issued April 11, 2005 Cover Letter (26KB) Foreword (44KB) Fact Sheet (60KB) Acronyms (15KB) Table of Contents, List of Tables and Figures (37KB) Chapter 1 - Introduction (1.74MB) Chapter 2 - Seismic Background and Context (1.3MB) Chapter 3 - Design of the Brightwater Treatment Plant (2.22MB)Chapter 4 - Worst-Case Earthquake Scenarios Assumed in the Impacts Analysis (1.41MB) Chapter 5 - Envrionmental Impacts If a Major Earthquake were to Damage Brightwater Facilties and Mitigation of Impacts (1.0MB) Scenario Tables (79KB) Glossary (84KB) Distribution List (31KB) Draft Supplemental EIS Appendices (note large file sizes)
Appendix A - Surface-Fault-Rupture Hazard Evaluation (14.2MB) Appendix B - Revised Probabilistic Seismic Hazard Analyses (3.8MB) Appendix C - Building Code Regulations and Seismic Studies Used in the Structural Design of the Brightwater Facilities (108KB) Appendix D - Emergency Overflow Surface Water Impacts Analysis (343KB) Appendix E - Analysis of Flooding and Water Quality Effects in Little Bear Creek Following a Major Earthquake (2.1MB) Appendix F - Brightwater SEPA Supplement Groundwater Evaluation (5.8MB) Note: though not issued as part of the Draft Supplemental EIS, an Appendix G has been added - see above under: 'Changes in the Supplemental EIS Text Made in Response to Comments' |