Holiday closure Monday May 28: Most county offices will be closed in observance of Memorial Day.

For questions about the Wastewater Treatment Division website, please send an e-mail message or contact us at:

King Street Center
201 S. Jackson St., Suite 500
Seattle, WA 98104-3855
Phone: 206-684-1280
Fax: 206-684-1741
Telecommunication device for the deaf (TTY): 711

Get Directions to our office location in Seattle, Washington.

Staff Contacts

Puget Sound shoreline next to the West Point Treatment Plant, Seattle

Juanita Bay Pump Station replacement

Facility operations

Juanita Bay Pump Station, Kirkland, WA, viewed from the west 
New Juanita Bay Pump Station, on the corner of N.E. Juanita Drive and 93rd Ave. N.E. April 2009
View more photos.

Landscaping at the Juanita Bay Pump Station, Kirkland, WA
Pump station landscaping, southwest corner.

Completed spring 2009

The King County Wastewater Treatment Division replaced the Juanita Bay Pump Station, at 9290 N.E. Juanita Drive, to increase capacity and ensure safe and reliable operations. The previous station site was too small, so the new pump station was constructed across street (93rd Avenue Northeast). Construction began in fall 2005 and was completed early 2009.

Background

  • The previous pump station was built in late1960s.
  • Pump station serves 7,650 acres in north Kirkland and part of the Northshore Utility District.
  • Station pumps wastewater east through two pipes to the main conveyance pipe that follows the Burlington Northern and Santa Fe Railway to the South Treatment Plant in Renton

Need for Project

  • Replace aging pump station to ensure safe and reliable operations.
  • Address critical capacity needs by increasing the pumping capacity from 14.2 million gallons per day (mgd) to a peak capacity of 30.6 mgd.
  • Meet current design standards, including odor and noise control.

Proposed Work

  • Replace the Juanita Bay Pump Station at 9290 N.E. Juanita Drive
  • Build a new pump station across 93rd Avenue Northeast from the existing pump station.
  • Leave existing pump station in service while the new station is built.
  • Design the building and landscaping to fit the neighborhood. (View design drawings on Library page and view photos of completed station.)
  • Choose equipment to enhance safe system operation and reduce odors and noise.