Duwamish/Diagonal Project PhotosClick on images to enlarge
 Dredging operations near the Diagonal storm drain and Duwamish CSO. December 3, 2003
|
 Contractor dredged from the shoreline to the navigation channel of the Lower Duwamish Waterway. December 3, 2003
|
 A 10-cubic yard bucket removed 68,250 cubic yards of contaminated sediment near the old outfall of the Diagonal Treatment Plant. December 3, 2003
|
 Sediment was loaded on barges and sent to a specially designed landfill. December 3, 2003
|
|