CSO control projects have been prioritized to protect public health, beginning with the construction of CSO control projects along Puget Sound beaches (2010-2011) and the east end of the Lake Washington Ship Canal (2015). The final phase of projects will be built along the Duwamish River and the west end of the Ship Canal.